Deep Tech · Grid Infrastructure

Megawatts
in Months.

AI-native, physics-informed digital twins that collapse grid interconnection timelines from years to weeks — enabling the next generation of AI data centers and industrial power.

2,000GWGrid Interconnection Backlog
50µsEMT Simulation Resolution
$30B+Beachhead Market Opportunity

The grid is stuck in
the 1990s.

The 2,000 GW Backlog

The American grid is choking on a massive interconnection queue. Legacy utilities running 1990s Root Mean Square (RMS) models cannot safely validate the power electronics and high-speed transients of modern energy projects.

Years of Delay

Interconnection studies drag on for years. AI data centers, manufacturing plants, and clean energy projects sit idle — unable to connect to a grid that lacks the software intelligence to validate them at the speed the market demands.

The 3FLUX Solution

AI Physics-Informed Real-Time Digital Twins. Laboratory-grade grid virtualization using 50-microsecond Electromagnetic Transient (EMT) simulation — the missing software intelligence layer on the grid.

Installed-Pending Queue — Live EIA Data

Capacity awaiting commercial operation

Fetching live EIA data…
Source: U.S. EIA Open Data API · MW total installed capacity

From Years to Weeks

Our AI-accelerated EMT simulation collapses the validation timeline for grid interconnection. What was a years-long engineering slog becomes a repeatable, deterministic software process.

Legacy RMS Studies2 – 7 Years
3FLUX EMT PlatformWeeks

The AI Physics-Informed
Digital Twin

Not a simulation tool — a complete interconnection validation platform. The missing software intelligence layer on the grid.

Real-Time EMT Simulation

50-microsecond Electromagnetic Transient resolution — capturing the physics that legacy RMS models miss entirely. Full-fidelity grid virtualization at laboratory grade, in real time.

50µs resolution

AI-Accelerated Validation

Machine learning layers trained on grid physics dramatically accelerate scenario analysis. Deterministic, repeatable validation — compressing what took years of engineering into weeks of software.

Weeks, not years

Grid Interconnection Intelligence

End-to-end interconnection planning from feasibility through regulatory approval. Our shared-gain pricing model aligns our success with yours — we win when your megawatts connect.

Shared-gain pricing

"So who do you tell? Whoever you need to, and no more."

— Peter Thiel, Zero to One

Addressing a $30B+
Opportunity

Three converging markets face the same critical bottleneck: grid interconnection. We solve it once — for all of them.

AI Data Centers

Gigawatt-scale compute facilities are the most acute sufferers of the interconnection backlog. Every month of delay is hundreds of millions in deferred revenue. Our platform is their fastest path to power.

Primary target

Electric Cooperatives

More than $30 billion in monetization opportunity. Cooperatives are modernizing faster than legacy utilities and actively seek tools to handle the new generation of grid-connected assets.

$30B+ monetization

Industrial & Manufacturing

Manufacturing reshoring demands new industrial loads that utilities can't validate. We're already a primary partner on a $30.2M transmission upgrade achieving a 3.7× benefit-cost ratio.

Project ENERA partner

Validated Traction

$5M
DOE Proposal — Rapid industrial load additions
$30.2M
Project ENERA — Transmission upgrade, 3.7× BCR
Lorem Inc
Lorem Ipsum — Strategic partnership
DOE
Grid Deployment Office — Project CINERA
Request Early Access